![]() |
||
| Bank | ||
| Combined System | ||
| Culture | ||
| Hotel | ||
| Industrial Application | ||
| Medical Application | ||
| Office | ||
| Residential Sector | ||
| Restaurant | ||
| Seminar & Congress | ||
| Sport & Leisure Complex | ||
| Store & Shop | ||
| Technical Application | ||
|
|||
| Technical Solution | Split / Sky Air | ||
| Address | Neptun | ||
| City | Neptun | ||
| Request | The complex refurbishment and rearrangement also included the installation of several air conditioning systems fto provide proper cooling of the rooms within the accommodation building assemblies, the restaurant and the conference center during the hot period. For air conditioning these areas flexible operating systems that should provide cooling under fluctuating conditions of the occupational degree specific to this type of application were required. Furthermore, an imposed basic condition was that the outer units and piping route mounting should not affect the building's architecture. The operation reliability and the air conditioning provision per areas were also imposed. | ||
| Solution | To ensure all required conditions for the air conditioning system were met, multiple air conditioning solutions based on the air conditioning area were proposed and chosen. The hotel rooms were air conditioned with multisplit inverter systems and split systems. The exterior units are mounted on the terrace of the housing building, and the joint pipes in the vertical passages specially built without affecting the architecture of the architecture facades. All exterior units are wall models. Sky Air systems with indoor cassette units and connectable to the duct were mounted for the restaurant and conference rooms' air conditioning. | ||
| Building Text | The Complex includes the accommodation building assemblies where the following are located: the hotel rooms, the policlinic including the treatment center, the conference center and the restaurant. All the complex buildings were refurbished and rearranged recently offering optimum conditions for treatment and rest. | ||
| Application Type | Hotel | ||
| Construction Type | Refurbishment | ||
| Commissioning Date | 2004 | ||
| Technical Information | |||||||
| Total Surface m² | 8500 | ||||||
| Total AC Surface m² | 7000 | ||||||
| Cooling capacity kW | 695 | ||||||
| Number / Type of Indoor Units | 61/FTY18J, 174/FTKS25B,18/FT18G,13/FT18JZ,4/FLY22G,1/FTY60G,21/FHY45B,2/FHYC125B,4/FHYC60B | ||||||
| Number / Type of Outdoor Units | 14/3MKS50B,33/4MKS75B,8/MAE32G,1/MA45D,13/R18GZ,61/REY18G, 4/REY22G, 1/RY60F, 1/RYP71L, 7/R125B, 2/RY250F | ||||||
| Indoor Unit Application |
|
||||||
| Control System | Individual control | ||||||
| Options | Fresh air system for restaurant and conference center | ||||||
| Consultant (Designer) | DACE Romania | ||||||
| Architect | RAAPPS | ||||||
| Installer | Integral Technic Trade | ||||||
| Investor | RAAPPS | ||||||
| Link | http://www.complexdoina.apps.ro/amplasare/ | ||||||
Hotel Doina
|
||||||