![]() |
||
| Bank | ||
| Combined System | ||
| Culture | ||
| Hotel | ||
| Industrial Application | ||
| Medical Application | ||
| Office | ||
| Residential Sector | ||
| Restaurant | ||
| Seminar & Congress | ||
| Sport & Leisure Complex | ||
| Store & Shop | ||
| Technical Application | ||
|
|||
| Technical Solution | Chillers/FCU | ||
| Address | Bdul.Ferdinand 12 | ||
| City | Constanta | ||
| Request | The beneficiary's desire was to ensure the common areas are cooled by means of a cheap and efficient air conditioning system. The operation reliability and the air conditioning provision per area were also conditions in choosing the air conditioning solution. | ||
| Solution | To ensure all conditions imposed for the air conditioning system were met, the air conditioning system solution based on cooling aggregate and Daikin air converters was proposed and chosen. The encased ground floor air converters were inlaid with the existing static assemblies according to the beneficiary's recommendations. The advantage of the chosen system is that it can allow a relatively high cooling capacity in a small mounting area. The system can provide maximum or partial cooling capacity. | ||
| Building Text | Refurbished building - ground floor and 4 floors provided with all necessary facilities to ensure comfort. | ||
| Application Type | Hotel | ||
| Construction Type | Refurbishment | ||
| Commissioning Date | 2005 | ||
| Technical Information | |||||||
| Total Surface m² | 1000 | ||||||
| Total AC Surface m² | 800 | ||||||
| Cooling capacity kW | 102 | ||||||
| Number / Type of Indoor Units | 18/FWM04, 11/FWM08 | ||||||
| Number / Type of Outdoor Units | 1/EUWAB40 | ||||||
| Indoor Unit Application |
|
||||||
| Control System | Individual control | ||||||
| Options | Fresh air for main lobby. | ||||||
| Consultant (Designer) | Control Service srl | ||||||
| Installer | Control Services srl | ||||||
| Investor | Dobre si Fii | ||||||
| Link | http:// | ||||||
Hotel Ferdinand
|
||||||